Industry Leading Power Protection Solutions

Request a Callback

Load Bank Testing

Overview

Our comprehensive commissioning procedures and regular service of your UPS and batteries will go along way in ensuring the integrity of your critical power protection system. However, there is only one certain way of establishing that all the vital components of your power protection system are functioning correctly together and will perform as intended – load bank testing.

Our load bank testing service simulates maximum load conditions to stress the UPS, and the entire electrical supply infrastructure including cabling, switchgear, fuses and other components to identify potential system weaknesses.  Potential risks to your critical load can therefore be identified, rectified and minimized.

Additionally, our load bank service can be used to discharge batteries as an effective, accurate and relatively low cost method of determining battery autonomy.

Key Benefits

  • Performance testing of the UPS and entire electrical supply infrastructure, giving total confidence in critical power supply integrity
  • Battery discharge testing for accurate, effective and low cost proof of battery integrity and autonomy
  • Engineer controlled tests tailored to your requirements, ensures no unnecessary testing
  • Out of hours testing can be arranged, minimising disruption to user operations
  • Kohler Uninterruptible Power’s ISO procedures and certifications assure quality of service and compliance with health and safety legislation.
  • Mobile AC and DC load banks of any size available, allowing testing of any installation anywhere.
  • Fully documented, procedures ensuring full traceability of all test events and actions

 

Request a Free Quote

SITE SURVEY REQUEST

SITE SURVEY REQUEST

Need a Power Protection system? Request our free survey now

HEALTH CHECK

HEALTH CHECK

Not sure you have the correct UPS setup - request a check now

CONTACT US

CONTACT US

For more information about our products & services